ZeroGen | A Pathway to Zero company

Fuel the Future.
Cut Carbon.
Grow Returns.

Developing projects that advance Ireland’s goal of achieving Net-Zero Emissions by 2050.

42 MWDistributed HVO generation

10-yearFixed EirGrid capacity contract

Up to 90%Lifecycle GHG savings with HVO

IrelandSites across the national grid

01   About ZeroGen

Understanding ZeroGen: Mission, Identity & Impact

ZeroGen is developing distributed generation assets across Ireland to deliver grid flexibility, system stability, and national decarbonisation objectives.

Established2025

GroupPathway to Zero

TechnologyHVO-fuelled DSU generation

Containerised 2.5MVA Generator with Emissions Treatment System

42MW

Low-emissions standby generation distributed across Ireland for DSU services

2028/ 2029

T-4 EirGrid Capacity Auction

10year

Fixed contract

2025

Year ZeroGen was established

02   The ZeroGen Project

42 MW. One Strategic Energy Platform.

Delivering 42 MW of Hydrotreated Vegetable Oil (HVO) units, operating as Demand Side Units (DSUs). The project is secured with fixed revenue from an 10-year EirGrid Capacity Market contract.

42 MWHVO generation capacity

DSU generationDemand Side Unit services

Grid flexibilityFor Ireland’s electricity system

  • Multiple sites distributed across Ireland, operating as Demand Side Units
  • Fixed revenue secured through an 10-year EirGrid Capacity Market contract
  • Low-emission HVO generation supporting Ireland’s Net-Zero 2050 goal
Indicative distributed sitesIsland of Ireland

Up to90%

Lifecycle GHG savings vs fossil diesel

03   HVO Fuel

HVO: The Next Generation of Clean Power

HVO fuel is a Renewable Energy Directive (RED) III compliant renewable bio-fuel produced from waste and residue feedstocks. It offers significant environmental benefits, providing lifecycle greenhouse gas (GHG) savings of up to 90% compared to fossil diesel.

Renewable bio-fuel

Produced from waste and residue feedstocks rather than virgin resources.

RED III compliant

Meets the requirements of the EU Renewable Energy Directive III.

Up to 90% lower lifecycle GHG

Compared to fossil diesel, across the fuel’s full lifecycle.

04   Strategic Approach

Our Flagship 42 MW Project

Our flagship 42 MW project will be developed following this strategic approach:

01

Generate

Install low-emission HVO generators at multiple sites, ensuring compliance with environmental and planning requirements.

02

Integrate

Enable DSU programme participation via compliant electrical integration, metering, and remote-control capability.

03

Upgrade

Upgrade electrical infrastructure to support the generator.

04

Comply

Grid Code compliance.

05   Why It Matters

Powering a More Flexible Irish Grid

I

Grid Flexibility

Supporting Ireland’s electricity system when flexibility and responsive generation are required.

II

System Stability

Providing distributed generation capacity to support a resilient electricity network.

III

Decarbonisation

Supporting Ireland’s national pathway towards Net-Zero emissions by 2050.

06   Contract & Partners

A Contracted Route to the Irish Grid

ZeroGen has secured a contract with DSU Operator to design, deliver and own 42 MW of HVO fuelled genset packages for use as DSU generation services at various sites around Ireland.

Asset owner & developer

ZeroGen

Designs, delivers and owns 42 MW of HVO fuelled genset packages at sites around Ireland.

DSU services provider

DSU Operator

Manages the EirGrid capacity contracts on behalf of ZeroGen, and provides the DSU services as the interface with EirGrid.

Transmission system operator

EirGrid

Capacity Market counter party. 2028/2029 T-4 capacity auction for demand response to the wholesale electricity grid.

Capacity auction

40 MW secured in the T-4 Capacity Auction, 17 December 2024

ZeroGen have secured installed generating capacity of 40 MW in the T-4 Capacity Auction in respect of Capacity Year 2028/2029.

Demand response

40 MW demand response to the wholesale electricity grid

EirGrid 2028/2029 T-4 capacity auction to provide 40 MW demand response to the wholesale electricity grid.

Contract term

10-year fixed contract from October 2028

With additional 1 year revenue from October 2027.

Contract management

DSU Operator manages the EirGrid capacity contracts

On behalf of ZeroGen, providing the DSU services which is the interface with EirGrid.

07   Programme

Key Milestones

Phase 2 EIIS delivery path, from first installations to capacity revenue and redemption.

Phase 1 EIIS

2025

Phase 1 EIIS complete: €5.5m raised and 40 MW contracted with host sites.

Equipment delivery

Q2 2026

First batch of long-lead equipment delivered and undergoing installation at host sites.

Construction

Q3 2026

Construction commences; purchase orders issued for approx. 75% of key equipment.

Phase 2 EIIS

Q4 2026

Phase 2 EIIS raise of €5.5m completes by 31 December 2026.

Electrical & grid

Q1 2027

MV and LV electrical installation, grid connection and controls works progress.

Commissioning

Q4 2027

Full portfolio commissioned; revenue commences 1 October 2027.

Capacity contract

Q4 2028

10-year T-4 capacity contract starts, delivering 42 MW of DSU capacity.

EIIS redemption

2030

EIIS redemption, Phase 1.

EIIS redemption

2031

EIIS redemption, Phase 2.

08   Investment

Investment Pathway

The investment process follows a defined sequence of steps, from invitation through information and expressions of interest to closing.

01

19th October

Invitation to invest opens. Email your interest to zerogen@p2z.ie

02

13th November

Expressions of Interest Close, or earlier if subscription target is met

03

23rd November

Subscription Agreement issued to interested investors

04

3rd December

Return signed agreements and transfer investment to ZeroGen

Investor Notice

This Document has been prepared and issued by ZeroGen Limited (“Company”) based on materials and information supplied by the Company for the sole purpose of assisting you in deciding if you wish to proceed with a further investigation of the Company with a view to a potential investment in the Company.

This Document is for information purposes only and is not a prospectus within the meaning of the Investment Funds, Companies and Miscellaneous Provisions Act 2005 or the Prospectus (Directive 2003/71/EC) Regulations 2005.

Nothing in this Document or any related information should be regarded as investment advice provided by the Company within the meaning of the Investment Intermediaries Act 1995, the Markets in Financial Instruments and Miscellaneous Provisions Act 2007 or the European Communities (Markets in Financial Instruments) Regulations 2007.

The Document is strictly for information purposes and does not purport to be comprehensive, all inclusive or to contain all the information that a prospective investor may desire in investigating the Company and may be subject to updating, revision or amendment.

Request Further Information

zerogen@p2z.ie

Register your interest

Complete the form below and a member of the ZeroGen team will be in touch.

This field is for validation purposes and should be left unchanged.